Skip to content

Board

What this is for. The Board is the work surface for conversations. Each card is a thread: you drag it across stages, filter by project, and open it to talk. Kanban, list, timeline, graph, and dashboard all read the same filtered set.

  • You want to see every open thread in a project as columns (or all projects at once).
  • You need to move work to the next stage, pin a card, or spot overdue / stuck / waiting-approval items.
  • You want a list you can sort, a timeline of due dates, or a graph of an orchestration run.
  • You want today’s throughput, cost, and live runs without leaving the board.
  • You are about to start a new conversation in a given project and stage.
  1. Open Board in the sidebar (Main section) — route /board.
  2. Pick a project (or All projects). Switch Kanban / List / Timeline / Graph / Dashboard as needed.
  3. Drag a card to a new stage, or click it to open the conversation.
  4. You should see the card in the new column (and the conversation Stage field match). Filters stay when you switch views.

Tracks conversations as cards across projects and stages.

Control Meaning
All projects Show cards from every project
Project picker Restrict to one project
Empty: No projects yet Create a project first (Projects)
Control Meaning
New Start creating a card/conversation
Conversation title… Title for the new conversation
View What you see
Kanban Columns by stage (or group-by); drag-and-drop
List Tabular rows with sort/filter actions
Timeline Time windows of activity and due dates
Graph Orchestration or stage-flow graph
Dashboard Aggregate metrics for the board
Option Meaning
Stage Columns = pipeline stages
Priority Columns = priority
Assignee Columns = assignee (Unassigned bucket)
Badge / field Meaning
Title Conversation title (Untitled if empty)
Pinned Pinned to Board pin strip / Home
Status Working Agent actively working
Status Waiting Waiting for reply
Status Approval Waiting approval
Status Error Failed run
N/M subtasks Done / total subtasks
N% context Context window utilisation hint
Overdue date Past due
$cost Spend attributed to the card
Aging Nh / Nd / stuck How long since update / stuck duration
Control Meaning
Fold column Collapse column UI
Drop here Drop target while dragging
WIP n/limit Work-in-progress count vs limit
Filter Meaning
Stage Stage filter
Priority Priority filter
Tags Tag filter
State Active / Done / All Lifecycle state
Name… Title search
Content… Full-text in content

Tags are a board filter, not a project tree. Category names such as module and area are examples you create on this instance; values live on the conversation. Pick a project, then a tag, to slice work inside that project. Conversation tags also appear as one tags: … line in the prompt suffix (not the cache prefix).

Urgent · High · Normal · Low

Column / action Meaning
P Priority
ID Identifier
Title Title
Project Project
Updated Last update (relative time)
Pin Pin/unpin
Archive Archive conversation
Delete toast + Undo Soft delete with undo
Label Meaning
Active Pinned set
Status icons Working / Waiting for reply / Waiting approval / Error
Control Meaning
Window 1h / 24h / 7d / 30d Visible time range
Now Current time marker
Agent runs Run events
Due Due markers
Updated Update events
Metric Meaning
Open tasks Not done
Done today Completed today
In progress Active WIP
Running Live agent runs
Waiting approval Approval queue
Completed today Throughput today
Cost today Spend
Throughput Completion rate
Activity Activity chart
Running now Live list
Priority mix Distribution
Tasks per stage Per-stage counts
Live / Disconnected Realtime link health
Control Meaning
Mode Orchestration Multi-agent run graph
Mode Stage flow Stage transition graph
Orchestration run selector Which run to visualise