Skip to content

Board

What this is for. The Board is the work surface for conversations. Each card is a thread: you drag it across stages, filter by project, and open it to talk. Kanban, list, timeline, graph, and dashboard all read the same filtered set.

  • You want to see every open thread in a project as columns (or all projects at once).
  • You need to move work to the next stage, pin a card, or spot overdue / stuck / waiting-approval items.
  • You want a list you can sort, a timeline of due dates, or a graph of an orchestration run.
  • You want today’s throughput, cost, and live runs without leaving the board.
  • You are about to start a new conversation in a given project and stage.
  1. Open Board in the sidebar (Main section) — route /board.
  2. Pick a project (or All projects). Switch Kanban / List / Timeline / Graph / Dashboard as needed.
  3. Drag a card to a new stage, or click it to open the conversation.
  4. You should see the card in the new column (and the conversation Stage field match). Filters stay when you switch views.

Tracks conversations as cards across projects and stages.

ControlMeaning
All projectsShow cards from every project
Project pickerRestrict to one project
Empty: No projects yetCreate a project first (Projects)
ControlMeaning
NewStart creating a card/conversation
Conversation title…Title for the new conversation
ViewWhat you see
KanbanColumns by stage (or group-by); drag-and-drop
ListTabular rows with sort/filter actions
TimelineTime windows of activity and due dates
GraphOrchestration or stage-flow graph
DashboardAggregate metrics for the board
OptionMeaning
StageColumns = pipeline stages
PriorityColumns = priority
AssigneeColumns = assignee (Unassigned bucket)
Badge / fieldMeaning
TitleConversation title (Untitled if empty)
PinnedPinned to Board pin strip / Home
Status WorkingAgent actively working
Status WaitingWaiting for reply
Status ApprovalWaiting approval
Status ErrorFailed run
N/M subtasksDone / total subtasks
N% contextHow full the model’s context window is — the same measurement as the conversation’s context bar: the prompt size the provider reported for the last model call where available, otherwise an estimate (system prompt plus history), against the answering model’s own window. Colours follow the theme
Overdue datePast due
$costSpend attributed to the card
Aging Nh / Nd / stuckHow long since update / stuck duration
ControlMeaning
Fold columnCollapse column UI
Drop hereDrop target while dragging
WIP n/limitWork-in-progress count vs limit
FilterMeaning
StageStage filter
PriorityPriority filter
TagsTag filter
State Active / Done / AllLifecycle state
Name…Title search
Content…Full-text in content

Tags are a board filter, not a project tree. Category names such as module and area are examples you create on this instance; values live on the conversation. Pick a project, then a tag, to slice work inside that project. Conversation tags also appear as one tags: … line in the prompt suffix (not the cache prefix).

Urgent · High · Normal · Low

Column / actionMeaning
PPriority
IDIdentifier
TitleTitle
ProjectProject
UpdatedLast update (relative time)
PinPin/unpin
ArchiveArchive conversation
Delete toast + UndoSoft delete with undo
LabelMeaning
ActivePinned set
Status iconsWorking / Waiting for reply / Waiting approval / Error
ControlMeaning
Window 1h / 24h / 7d / 30dVisible time range
NowCurrent time marker
Agent runsRun events
DueDue markers
UpdatedUpdate events
MetricMeaning
Open tasksNot done
Done todayCompleted today
In progressActive WIP
RunningLive agent runs
Waiting approvalApproval queue
Completed todayThroughput today
Cost todaySpend
ThroughputCompletion rate
ActivityActivity chart
Running nowLive list
Priority mixDistribution
Tasks per stagePer-stage counts
Live / DisconnectedRealtime link health
ControlMeaning
Mode OrchestrationMulti-agent run graph
Mode Stage flowStage transition graph
Orchestration run selectorWhich run to visualise