What this is for. The Board is the work surface for conversations. Each card is a thread: you drag it across stages, filter by project, and open it to talk. Kanban, list, timeline, graph, and dashboard all read the same filtered set.
- You want to see every open thread in a project as columns (or all projects at once).
- You need to move work to the next stage, pin a card, or spot overdue / stuck / waiting-approval items.
- You want a list you can sort, a timeline of due dates, or a graph of an orchestration run.
- You want today’s throughput, cost, and live runs without leaving the board.
- You are about to start a new conversation in a given project and stage.
- Open Board in the sidebar (Main section) — route
/board.
- Pick a project (or All projects). Switch Kanban / List / Timeline / Graph / Dashboard as needed.
- Drag a card to a new stage, or click it to open the conversation.
- You should see the card in the new column (and the conversation Stage field match). Filters stay when you switch views.
Tracks conversations as cards across projects and stages.
| Control | Meaning |
|---|
| All projects | Show cards from every project |
| Project picker | Restrict to one project |
| Empty: No projects yet | Create a project first (Projects) |
| Control | Meaning |
|---|
| New | Start creating a card/conversation |
| Conversation title… | Title for the new conversation |
| View | What you see |
|---|
| Kanban | Columns by stage (or group-by); drag-and-drop |
| List | Tabular rows with sort/filter actions |
| Timeline | Time windows of activity and due dates |
| Graph | Orchestration or stage-flow graph |
| Dashboard | Aggregate metrics for the board |
| Option | Meaning |
|---|
| Stage | Columns = pipeline stages |
| Priority | Columns = priority |
| Assignee | Columns = assignee (Unassigned bucket) |
| Badge / field | Meaning |
|---|
| Title | Conversation title (Untitled if empty) |
| Pinned | Pinned to Board pin strip / Home |
| Status Working | Agent actively working |
| Status Waiting | Waiting for reply |
| Status Approval | Waiting approval |
| Status Error | Failed run |
| N/M subtasks | Done / total subtasks |
| N% context | How full the model’s context window is — the same measurement as the conversation’s context bar: the prompt size the provider reported for the last model call where available, otherwise an estimate (system prompt plus history), against the answering model’s own window. Colours follow the theme |
| Overdue date | Past due |
| $cost | Spend attributed to the card |
| Aging Nh / Nd / stuck | How long since update / stuck duration |
| Control | Meaning |
|---|
| Fold column | Collapse column UI |
| Drop here | Drop target while dragging |
| WIP n/limit | Work-in-progress count vs limit |
| Filter | Meaning |
|---|
| Stage | Stage filter |
| Priority | Priority filter |
| Tags | Tag filter |
| State Active / Done / All | Lifecycle state |
| Name… | Title search |
| Content… | Full-text in content |
Tags are a board filter, not a project tree. Category names such as module and area are examples you create on this instance; values live on the conversation. Pick a project, then a tag, to slice work inside that project. Conversation tags also appear as one tags: … line in the prompt suffix (not the cache prefix).
Urgent · High · Normal · Low
| Column / action | Meaning |
|---|
| P | Priority |
| ID | Identifier |
| Title | Title |
| Project | Project |
| Updated | Last update (relative time) |
| Pin | Pin/unpin |
| Archive | Archive conversation |
| Delete toast + Undo | Soft delete with undo |
| Label | Meaning |
|---|
| Active | Pinned set |
| Status icons | Working / Waiting for reply / Waiting approval / Error |
| Control | Meaning |
|---|
| Window 1h / 24h / 7d / 30d | Visible time range |
| Now | Current time marker |
| Agent runs | Run events |
| Due | Due markers |
| Updated | Update events |
| Metric | Meaning |
|---|
| Open tasks | Not done |
| Done today | Completed today |
| In progress | Active WIP |
| Running | Live agent runs |
| Waiting approval | Approval queue |
| Completed today | Throughput today |
| Cost today | Spend |
| Throughput | Completion rate |
| Activity | Activity chart |
| Running now | Live list |
| Priority mix | Distribution |
| Tasks per stage | Per-stage counts |
| Live / Disconnected | Realtime link health |
| Control | Meaning |
|---|
| Mode Orchestration | Multi-agent run graph |
| Mode Stage flow | Stage transition graph |
| Orchestration run selector | Which run to visualise |